Pricing Table Design Templates and Examples

A clear pricing table helps visitors pick a plan in seconds. Below are 33 pricing table and pricing page design templates, from classic plan cards and feature comparison charts to SaaS, hosting and creative layouts. We also cover what to include, the most common layouts and pricing table design tips that improve conversions.

Pricing Table Design Templates and Examples by UI Creative

Every pricing table on this page:

  • Editable Photoshop (PSD) and Adobe XD files
  • Fully organized layers, RGB, free Google Fonts
  • A UI design to customise and hand off to developers, not coded HTML

What makes a good pricing table?

A pricing table compares your plans side by side: name, price, what is included and a button to choose. The best ones are easy to scan, highlight one recommended plan and remove any doubt about what customers get.

  • Three or four plans: enough choice without overwhelming.
  • One highlighted plan: a Most Popular or Recommended label guides the decision.
  • Clear prices: big numbers with the billing period right next to them.
  • Short feature lists: the differences between plans, not every feature.
  • A visible button on every plan with clear wording like Get Started or Start Free Trial.

Classic pricing card layouts

Three or four plan cards side by side, with the recommended plan highlighted. The most common pricing table on SaaS and service websites.

Four-plan pricing table with recommended middle plan

1. Basic to Enterprise, Blue

Four clean white plans from $0 to $34 with a Recommended Professional plan raised in the middle and a monthly/annual switch.

Business plan pricing cards with illustrations

2. Choose Your Business Plan

Four outlined cards with illustrations, a Most Popular banner and a billing toggle.

Three-plan pricing table on a blue wave

3. Recommended Plan, Blue Wave

Three cards on a blue wave, with the Premium plan raised and a Start Free Trial button.

Pricing page with highlighted blue Pro plan

4. Student, Pro, Company

A website-style pricing page with a bright blue Pro card raised between two white plans.

Bronze, gold and platinum pricing cards

5. Bronze, Gold, Platinum

Three white cards with large orange prices and a Popular ribbon, on a turquoise background.

Pink gradient pricing cards with popular plan

6. Purchase Method, Pink

Four rounded cards on a pink-to-orange gradient, with a Popular Pro plan outlined in blue.

Illustrated three-plan pricing table

7. Purchase Option Kit

Three illustrated plans for Study, Pro and Enterprise with big blue Get Started buttons.

Green four-plan pricing cards

8. Easy Way to Connected

Four green-tab cards on a green wave, with a contact-us option for the top plan.

Three-plan pricing cards with purple buttons

9. Choose Your Best Plan, Purple

Three white cards with purple Started buttons and feature notes beneath each plan.

Comparison table pricing designs

A feature grid with check and cross marks, for products with many features. Customers compare plans line by line.

Pricing comparison chart with check and cross marks

10. Pricing Comparison Chart

A five-column chart on violet, with fees and features ticked or crossed per plan.

Bronze, gold and platinum feature comparison table

11. Bronze, Gold, Platinum Comparison

Plan headers with icons above a long feature comparison, on orange.

Four-plan pricing with a feature table below

12. Best Choice for Your Plan

Four plans in one white card with a feature table below, on soft purple and teal shapes.

Music streaming plan comparison table

13. Music for Everyone

A music streaming comparison with a popular column and a player bar at the bottom.

Product performance pricing comparison

14. Product Performance

Three plan columns with a blue feature list on the left for reporting and support.

Five-plan website builder comparison table

15. Choose Your Plan, Pink

A five-plan comparison from Free to Agency, with ribbons on the best-value plans.

Server package pricing comparison table

16. What Your Plan?

A green and blue server comparison with a Popular Pro plan and a monthly/yearly toggle.

Creative market plan comparison with icons

17. Creative Market Plans

A light green four-plan comparison with icons and Sign Up buttons.

SaaS, hosting and app pricing tables

Plans for software, hosting and digital services, usually with storage, users or bandwidth listed per tier.

Ribbon-shaped web hosting pricing plans

18. Web Hosting, Purple Ribbons

Three ribbon-shaped plans with avatars and pink cart buttons, on purple.

Navy hosting pricing plans with savings

19. Hosting, Navy

Three navy plans with strikethrough prices, savings badges and a Best Seller outline.

Dark URL shortener pricing plans

20. URL Shortener, Dark

Four plans on dark navy, with a bold coral Gold plan in the middle.

Hosting pricing plans with spec tables

21. Hosting Pro, Green Lights

Four plans with spec tables and a starred Pro plan on a dark green photo.

Simple five-plan pricing table

22. Simple Pricing Table

Five plans with icons and specs, ending in a red Enterprise contact plan.

Stacked pricing plan list with feature checklist

23. Choose Your Plan, List

A stacked plan list with orange buttons and a feature checklist beside it.

Enterprise package pricing with trial notes

24. Enterprise Package

Four plans with icons and 30-day trial notes inside a framed card.

Creative and media pricing designs

Pricing for streaming, stock images, creative services and memberships, with more visual layouts.

Movie streaming pricing plans

25. Watch Movie Like a Reality

Four streaming plans with colored top bars and a starred Premium plan.

Film and TV streaming pricing page

26. Film and TV Plans

Four plans with a red Recommended Premium plan and a website header.

Two-plan music offer pricing with photo

27. Go Get Your Plan

A two-plan music offer with a photo panel, on orange and navy.

Stepped dark stock image pricing plans

28. Stock Images, Dark

Stepped black and purple plans that grow taller with each tier.

Stock photo pricing with highlighted agency plan

29. Best Offer Agency

Four plans with a big blue blob highlighting the Agency plan.

Job market pricing plans with portraits

30. Job Market, Yellow

Three plans with black-and-white portraits on yellow.

Creative service package pricing cards

31. Package to Suit Your Plan

Four service packages for design, development, photography and TV, with icons.

Horizontal pricing list layout

32. Pricing List, Orange

A horizontal pricing list with orange prices and Get Started buttons per row.

Purple subscription pricing plans

33. Subscription Plans, Purple

Three subscription plans with a lilac highlighted middle tier, on deep purple.

What to include in a pricing table

ElementWhy it matters
Plan namesShort names that say who the plan is for: Basic, Pro, Business, Enterprise
Price and billing periodPer month or per year; show annual savings if you offer them
Monthly/annual toggleLets visitors switch prices without leaving the table
Key features per planThree to six items that explain the difference between tiers
Recommended badgeDraws attention to the plan most customers should pick
Call-to-action buttonOne clear action per plan: Get Started, Buy Now or Contact Sales
Free trial or guaranteeReduces risk and the last bit of hesitation
FAQ below the tableAnswers billing, cancellation and upgrade questions

Pricing table design tips

  • Put the recommended plan in the middle and make it slightly bigger or a different color.
  • Order plans from cheapest to most expensive, left to right.
  • Use a comparison grid only when products have many features; otherwise keep cards simple.
  • Show savings for annual billing as a percentage or a strikethrough price.
  • Design the mobile version: stack cards vertically or let them scroll sideways.
  • Keep button wording consistent across plans, except for a Contact Sales enterprise plan.
  • Match the rest of the page; see our landing page inspiration and admin dashboard designs.

Frequently asked questions

What is a pricing table?

A section of a website that compares plans or packages side by side, with prices, features and a button to choose each plan.

How many plans should a pricing table have?

Usually three or four. Fewer limits choice; more makes it harder to decide. Highlight one recommended plan.

What makes a pricing page convert?

Clear prices, one recommended plan, short feature lists, visible buttons, a free trial or guarantee, and an FAQ that answers billing questions.

What files are these pricing table templates?

Editable Photoshop (PSD) and Adobe XD files with organized layers and free Google Fonts. Many are built on a 1140 px Bootstrap grid.

Are these pricing tables coded?

No. They are UI design files to customise and hand off to developers or rebuild in your website builder.

Looking for more pricing table designs?

Browse the full collection of website UI templates.