Pricing Table – Project Planner

Purple Orange Project Plans pricing table template for Photoshop: four project plans with purple buttons and a website header
Buy this for $7
or
Buy a pack of 10 for $15Download any 10 products (excluding fonts) after purchase.

A pricing table section with a website header (Fasti logo, menu and a Start Free Trial button) and tabs, set in Poppins with Montserrat: a Package for Your Plans title and Basic $0, Premium $34 (marked Popular in orange), Pro $73 and Elite $126 cards with purple Get Started buttons.

What's in the white, purple and orange download

  • No Adobe apps needed: open the white, purple and orange PSD free in Photopea in your browser or in PhotoCraft, a free open-source app, with the text still editable
  • 1 white, purple and orange design at 1500 × 1000 px, 144 DPI, RGB, in one Photoshop (PSD) file
  • Fonts in the white, purple and orange design: Montserrat and Poppins, all free on Google Fonts
  • Also in the download: an Adobe XD version of the same design
  • Also in the download: a flat JPG of the design
  • A design, not code: rebuild the section in your site builder, or export it as an image for a page or slide

Browse every set in the pricing table templates shop.